Well-Known Member
Alright folks
Just wondering if anyone in the building trade or with decent kennels has any words of wisdom reguarding kennel concrete for the runs?
Not really planning on doing anything with the runs except a polished concrete finish but will be tiling the sleeping area indoors (seen some cheap tiles at wickes today £4 per m)
Not entirely sure if going to hand mix it or get a jeagger in yet. Got about 60m2 all in to do in a couple of different bits but weather forecast looking sketchy for coming week again same as last week, threat of rain or a shower almost every day
If ready mix is there anything u'd ask for??
And if hand batching is there any additives worth using? Waterproofers? SBR?
(I know most pro's will think i'm mental even thinking abiut hand mixing but for me its relatively stress free as ur not under pressure when trying to lay6-8 cube all urself, esp if i have f**ked up a level somewhere which is not unheard off
)
Run fall, the runs will be 1.5x 3m, meaning to fall them 2 ways and putting a single block divider between runs.
Wot sort of fall would i need?
Thought 1-2" across the 1.5m and mibee 4" over the 3m.
as meaning to put a decent fall on them.
The other thing with working/laying concrete if u have a decent fall on the concrete do u need to tamp it less to stop the 'fat'? rising to the top and then washing away as the water rises?
For some reason the last few concrete jobs i've done for myself (bloody amatuers
) i get a nice polished looking finish when its semi dry but dries to a powdery type finish in the end, still seems to last but just a pain and u then have to paint it to seal it.
Dunno wot i've started doing wrong as it never used to be a problem previously
Cheers
Just wondering if anyone in the building trade or with decent kennels has any words of wisdom reguarding kennel concrete for the runs?
Not really planning on doing anything with the runs except a polished concrete finish but will be tiling the sleeping area indoors (seen some cheap tiles at wickes today £4 per m)
Not entirely sure if going to hand mix it or get a jeagger in yet. Got about 60m2 all in to do in a couple of different bits but weather forecast looking sketchy for coming week again same as last week, threat of rain or a shower almost every day
If ready mix is there anything u'd ask for??
And if hand batching is there any additives worth using? Waterproofers? SBR?
(I know most pro's will think i'm mental even thinking abiut hand mixing but for me its relatively stress free as ur not under pressure when trying to lay6-8 cube all urself, esp if i have f**ked up a level somewhere which is not unheard off
)Run fall, the runs will be 1.5x 3m, meaning to fall them 2 ways and putting a single block divider between runs.
Wot sort of fall would i need?
Thought 1-2" across the 1.5m and mibee 4" over the 3m.
as meaning to put a decent fall on them.
The other thing with working/laying concrete if u have a decent fall on the concrete do u need to tamp it less to stop the 'fat'? rising to the top and then washing away as the water rises?
For some reason the last few concrete jobs i've done for myself (bloody amatuers
Dunno wot i've started doing wrong as it never used to be a problem previously
Cheers