  1. #1

    Brickies

    Just wondering what the rate is per thou' these days, might be needing to do some alterations here soon.
    (The Unspeakable In Pursuit Of The Uneatable.) " If I can help, I will help!." Former S.A.C.S. member!

  2. #2
    Quote Originally Posted by finnbear270 View Post
    Just wondering what the rate is per thou' these days, might be needing to do some alterations here soon.
    Up here in the north it is around the 450-600 a thou depending on the site conditions, access ,tele handler,etc.
    "a man does good business when he rids himself of a turd"

  3. #3
    Quote Originally Posted by reiver View Post
    Up here in the north it is around the 450-600 a thou depending on the site conditions, access ,tele handler,etc.
    A touch over that here 700p/thou, but above site condions etc apply

  4. #4
    Down here you can get the same don by an Eastern European for the same price as a half decent medium sized sausage ����

  5. #5
    Quote Originally Posted by reiver View Post
    Up here in the north it is around the 450-600 a thou depending on the site conditions, access ,tele handler,etc.
    Same here in the north west, most of the lads we use if access and loading up is done for them will charge 400 per thousand, that's just for straight walls though ,lintels and cavity trays are a wee bit extra as an "extra"

    atb

    kjf

  6. #6
    Quote Originally Posted by rick6point5 View Post
    A touch over that here 700p/thou, but above site condions etc apply
    Waw 70p a brick ,,, still about 400 -500 here

  7. #7
    Just out of curiosity how long does it take to lay 1000 bricks?

  8. #8
    Quote Originally Posted by Pheasant Feeder View Post
    Just out of curiosity how long does it take to lay 1000 bricks?
    Straight walling a day

  9. #9
    When i was having my single story extension built 6 years ago the usual guy I used told me it would take 10 days for 2 brickies and a labourer. Then one of the guys I work with said his mate was looking for a job and he was a bricklayer he turned up asked for a pen and a sheet of paper, did a quote gave me a list of everthing he needed. and a price 800 cheaper than the other guy.
    He started the following day and did it all by himself including mixing and loading and 7 days later I was the proud owner of all the brickwork shell of a 8 mtr x 4 mtr single story extension.
    All I did was make sure everthing he needed was there for him when he needed it, the cost 1100.
    The only other thing I did not do was the plastering everthing else I did myself.
    The total cost of the extension less than 10000.
    Last edited by sikadog; 17-06-2015 at 08:23.
    AT THE AGE OF 50 I DECIDED I WAS GOING TO GROW OLD F***ING DISGRACEFULLY