Hi all,
I've got some concrete to pour at some point over the next couple of weeks. I'm borrowing a mates cement mixer for it (standard belle minimix). Due to access, I've got to wheelbarrow it about 50m from where I can mix it/where the bulk bags have been delivered to. As a result, I don't want to over fill the mixer/barrow.
Rather than mixed ballast, I've got sharp sand and gravel. I want to mix it on a 1:3:6 ratio of cement:sand:gravel.
Given the above ratio and using a shovel to gauge, how many shovel fulls will I fit in? Would I fit half a bag of cement, 6 of sand and 12 of gravel in per mix and be able to wheel it, or is that too much for both me and the mixer?
Any advice gratefully received!
Thanks
I've got some concrete to pour at some point over the next couple of weeks. I'm borrowing a mates cement mixer for it (standard belle minimix). Due to access, I've got to wheelbarrow it about 50m from where I can mix it/where the bulk bags have been delivered to. As a result, I don't want to over fill the mixer/barrow.
Rather than mixed ballast, I've got sharp sand and gravel. I want to mix it on a 1:3:6 ratio of cement:sand:gravel.
Given the above ratio and using a shovel to gauge, how many shovel fulls will I fit in? Would I fit half a bag of cement, 6 of sand and 12 of gravel in per mix and be able to wheel it, or is that too much for both me and the mixer?
Any advice gratefully received!
Thanks


4 x 25kg bags to 1/2 bag of dust = one full barrow most weeks i get to build a ramp or steps for access , but when i had the last shed base at my own home done i formed it up and i got the mix as you go guys in ,the base was 11ft x 21ft x 1ft Deep they had it done in three hours it looked hard work over my cold glass of beer ? as i'v got older i'v decided to work smarter 