I live in a fairly remote area and have been getting by on a system which has been getting progressively slower as EE have promised much on 4G and dont have sufficient capacity. I have therefore gone over to a private network (microwave) costs £400 to setup and £30 per month thereafter will be cancelling EE. have gone from 2/3 Mb/sec download/0.2 upload to 55Mb/sec download etc and I get the subs back from EE.
I notice BT are employing 1000 new starters to aid with fibre roll-out. Taken far too long to do this in the rural areas.
I notice BT are employing 1000 new starters to aid with fibre roll-out. Taken far too long to do this in the rural areas.