FAC grant Thames valley questions
Hi all. I have put in for a coterminous FAC and SGC application on 29 October 2025.
I had a call from xxxxxxxx in December (the FEO) and provided the DSC 1, land permission and a frankly silly “letter of competence”
Most of which were already attached to the application form.
What’s the etiquette with chasing these up? It’s been several weeks since I submitted these things and haven’t even had a confirmation that they have been received.
I don’t want to p*ss the TVP FL dept off by badgering them but wonder how long this normally lasts.
Thanks all please help a newbie out
Hi all. I have put in for a coterminous FAC and SGC application on 29 October 2025.
I had a call from xxxxxxxx in December (the FEO) and provided the DSC 1, land permission and a frankly silly “letter of competence”
Most of which were already attached to the application form.
What’s the etiquette with chasing these up? It’s been several weeks since I submitted these things and haven’t even had a confirmation that they have been received.
I don’t want to p*ss the TVP FL dept off by badgering them but wonder how long this normally lasts.
Thanks all please help a newbie out
Last edited by a moderator: